The Trolltunga road closure 2026

For the first week of June 2026, nobody could reach Trolltunga at all. Rockslides shut the only road to the trailhead. Here is what happened, what is still going on, and how not to get caught out next spring.

A narrow mountain road with rockfall netting on the slope and a closed barrier across the lane
Rockfall netting and a closed barrier on a mountain road.

Booking choice: The guided summer day hike, from $183 per person. Check dates Tour details

Every Trolltunga hike starts on one road. Skjeggedalsvegen climbs about 7 km from Tyssedal (P1) to the main trailhead at Skjeggedal (P2), and from there a smaller road continues to Mågelitopp (P3). Close that first stretch and the whole mountain is off limits, guided tours included.

That is what happened in spring 2026. This post covers the closure, the road hours that still apply after it, and the sources to watch before you book a trip for June 2027.

The quick answer

The road from P1 Tyssedal to P2 Skjeggedal was closed to all traffic, walkers included, until 8 June 2026 after several rockslides. It reopened on 8 June, the same day the P3 car park and the P2 to P3 shuttle started. The road is now open 06:00 to 21:00 with traffic control and shut overnight while protection work continues. No one has announced anything for 2027 yet, so check trolltunga.com before you commit to an early June date.

Why was the road to Trolltunga closed in 2026?

Rockslides. Several slid onto Skjeggedalsvegen, and the municipality closed the road to all traffic until 8 June 2026 because of an acute risk of more.

The notice from Visit Hardanger was blunt. The road between P1 Tyssedal and P2 Skjeggedal was closed completely, for cars, bikes and people on foot, because of "an acute risk of rockslides and necessary safety work in the area". Walking around the barriers was not allowed either. With the road shut, Skjeggedal, Mågelitopp and the trailhead could not be reached at all.

Visit Norway carried the same message on its Trolltunga page: closed until 8 June because of the risk of rockfalls and landslides. This was not a weather delay or a late snowmelt. It was a hillside that needed securing before anyone could drive under it again.

WhenWhat happenedSource
Spring 2026Several rockslides on Skjeggedalsvegen (P1 to P2)Visit Hardanger
Until 8 June 2026Road closed to cars, bikes and walkersVisit Hardanger, Visit Norway
8 June 2026Road reopens; P3 car park and Road Bus season starttrolltunga.com
Through July 2026Traffic control expected while safety work continuedVisit Hardanger
Late October 2026Open 06:00 to 21:00, closed overnight for protection worktrolltunga.com

Could you still hike to Trolltunga during the closure?

No. The trail starts above the closed section, so there was no legal way to the trailhead on foot, by car or with a guide.

The closure covered the whole stretch from P1 to P2, so even the 38 km walk from Tyssedal was off. A guided tour did not help: both the summer guided hike and the via ferrata meet at Skjeggedal. If you had a P2 day booked in the first week of June, it was gone.

Visit Hardanger pointed visitors to other walks in Ullensvang instead: Dronningstien, the Husedalen waterfalls, Bondhusvatnet, the Buerbreen glacier arm, and a guided Blue Ice Hike on Folgefonna. Buerbreen is a 6 km return walk from Buer near Odda, graded medium, with a steep finish. Keep that list. If the road shuts again, those are your backup days.

Sørfjorden and the town of Odda seen from a mountainside
Sørfjorden and Odda. The backup hikes during the closure were all within an hour of town.

Is the Trolltunga road open now, and what are the hours?

Yes. Skjeggedalsvegen is open daily from 06:00 to 21:00 with traffic control on site, and fully closed from 21:00 to 06:00 while rockslide protection work continues.

The trolltunga.com homepage says the road has reopened and the buses run as normal, with a caveat: some work remains, the road shuts overnight, and walkers should not go through the construction area. Those night hours matter more than they sound. A car parked at P2 after 21:00 is not going anywhere until 06:00.

Work backwards from that. The last Road Bus down from P3 leaves at 19:00 in summer (shuttle timetable), and Visit Norway tells hikers to start before 8 am. A late start from P2 plus a slow descent can leave you on the wrong side of the barrier. Start early, and use the shuttle on the way back if your legs are done.

Guided day hike from P2 with the P3 shuttle both ways, so the road timing is someone else's job.

Check dates for the guided summer day hike

What did the closure change for P3 and the shuttle in 2026?

Everything above P2 started on 8 June: the P3 Mågelitopp car park and the P2 to P3 Road Bus both opened that day.

The 2026 parking page gives the P3 season as 8 June to 30 September 2026, pre-booking only until 31 August. The Road Bus ran from 8 June to 27 September 2026. Neither could open before the road below them did.

The Odda shuttle had timetables from 15 May, with most routes from 22 May. Those buses end at P2, so until 8 June there was nowhere for them to take hikers. Our full 2026 fare list is in the parking and shuttle prices post.

Will the Trolltunga road be closed in 2027?

Nobody has said. As of 28 October 2026, trolltunga.com lists the 2027 Odda shuttle from 22 May to 26 September and the P3 dates as "to be announced".

The 2027 panel on trolltunga.com gives P1 and P2 parking as open all year, the Odda shuttle from 22 May to 26 September, and the P2 to P3 shuttle and P3 car park as "Date to be announced". That is normal for October. It also means there is no promise about early June.

The slope above Skjeggedalsvegen has been unstable enough to need overnight closures into the autumn. We would not assume a quiet spring. These are the places to check, in this order:

Where to checkWhat it tells youWhen to look
trolltunga.com homepageRoad hours, closures, shuttle and P3 datesWhen you book, and the week before
Visit Hardanger noticesFormal closure notices and backup hikesApril and May
Ullensvang municipalityNews on safety work on SkjeggedalsvegenSpring and late autumn
Visit Norway Trolltunga pageClosure banner and season rulesBefore you book flights
Tourist office, +47 480 70 777A human answer on current road statusIf the pages disagree

How should you plan a June 2027 trip around the road?

Give yourself a spare day, book things you can cancel, and do not build the whole trip around 1 June.

The self-guided season on trolltunga.com runs from 1 June to 30 September. In 2026 the first week of that window simply did not happen. Put Trolltunga in the middle of your stay in Odda, not on the first or last day, and keep one flexible day for weather or a late opening.

Free cancellation helps. The summer guided hike and the via ferrata both cancel for a full refund up to 24 hours before. For the other tours, check the listing's cancellation terms before you pay. Book a refundable room in Odda or Tyssedal too. And if the road does shut, our getting-there guide covers the bus and boat links you will still need for the backup hikes.

Trolltunga Guided Summer Day Hike

A guide, the P3 shuttle both ways and free cancellation up to 24 hours before. The safe way to book an early-season date.

★ 4.8 · 10 hours · from $183

Explore the guided summer day hike Tour details

Frequently asked questions

When did the Trolltunga road reopen in 2026?

On 8 June 2026. The P3 Mågelitopp car park and the P2 to P3 Road Bus opened the same day.

Is Trolltunga open now?

Yes. The road to P2 Skjeggedal is open from 06:00 to 21:00 with traffic control and closed overnight while protection work continues. From 1 October the official advice is to hike only with a guide.

Can you walk past the barrier if the Trolltunga road is closed?

No. The 2026 closure banned cars, bikes and walkers alike. There is no other route to the trailhead.

Will Trolltunga be open in June 2027?

No date has been confirmed. As of late October 2026 the P3 and shuttle dates for 2027 were listed as to be announced on trolltunga.com. Check there before you book.

Ready to book

Choose your tour

A local mountain guide on every option. Prices are from-prices in USD and move with the season; check each listing for its cancellation terms.

Trolltunga Guided Summer Day Hike

Trolltunga Guided Summer Day Hike

★ 4.8 · 10 hours

  • Guide with first-aid and safety gear
  • P2 to P3 shuttle up and back, weather permitting
  • Hiking poles, micro spikes if there is snow
From$183per personCheck dates
Trolltunga Day Hike with Lunch

Trolltunga Day Hike with Lunch

★ 4.9 · 11 hours

The only day hike here that carries lunch and hot drinks for you

From$188per personCheck dates
Trolltunga Via Ferrata & Sky Ladder Day

Trolltunga Via Ferrata & Sky Ladder Day

★ 4.8 · 10 hours

  • Guide with climbing and first-aid gear
  • Harness, helmet and via ferrata set
  • Optional 50 m Sky Ladder
From$188per personCheck dates

Plan your date before you go

A certified guide, the shuttle up to Mågelitopp and photos of you on the rock. Free cancellation up to 24 hours before.

Check dates for the guided summer day hike